Your crew is there to install. Why are they still cable cutting?

We pull, measure and cut your cable to the exact lengths your project needs, then deliver it ready to install.

01 · PROCESS

We move the cutting off your job site.

01 SEND YOUR SPECS
Give us the cable type, gauge, required lengths and quantities.

02 WE CUT TO SPEC
Every run is measured, cut, coiled and identified before it leaves our facility.

03 IT SHIPS READY TO INSTALL
Your crew receives cable prepared for the project, so field hours go into installation.

02 · COST

The cable is not the expensive part. Getting it ready is.

It never appears as a line item.

FIELD PREPARATION
Skilled labour measuring, cutting and handling instead of installing — billed as crew hours.

OVER-ORDER MARGIN
Extra length bought so the run never falls short, then scrapped — material plus disposal.

DELAYED START
Every run that begins with preparation begins late — paid through the schedule.

None of that is installation, and all of it is paid at field rates.

03 · EFFECT

AS ORDERED TODAY → AS CUT TO SPEC

Cable arrives in full reels → Cable arrives cut to your lengths

Your team measures, marks and cuts → Field hours go into installation

Safety-margin over-ordering → You order closer to what you will use

Handle offcuts and stage the scrap → Far less offcut on site

Installation takes time to start → Installation starts as the cable arrives

What changes on the project

04 · ESTIMATE

Enter your crew rate, the hours your team spends preparing cable and how many people do it. The example below shows field labour already being paid for preparation on one project.

EXAMPLE · $78 / hr × 14 hours × 3 people
FIELD LABOUR SPENT ON PREPARATION

Not sure it is worth it? Run your own numbers.

Example field labour spent on preparation
$ 0
05 · NOTES

Notes and clarifications

5.1 WHAT IF THE MEASUREMENTS CHANGE MID-PROJECT?
Specs change. Talk to our team about how changes and re-cuts are handled before you commit to a schedule.

5.2 CAN YOU MEET OUR SCHEDULE?
Lead time depends on cable type and volume. We confirm a firm date with your quote.

5.3 DO YOU HANDLE THE CABLE TYPES AND SIZES WE USE?
Send the cable type and gauge and we confirm what we can cut before anything is ordered.

5.4 WHAT IF IT ARRIVES CUT WRONG?
Every order is cut to the spec sheet you approve, with lengths and quantities confirmed before production.

5.5 IS THIS ONLY FOR TOC LOGISTICS CUSTOMERS?
No. Cable cutting is available on its own and alongside our warehousing, transportation and fulfilment services.

Start with one project.

You do not have to change how you buy cable. Take one project — the next one — and put our answer next to what you are doing today.

If it does not hold up on paper, you have lost a spec sheet and a phone call.